av手机免费在线观看,国产女人在线视频,国产xxxx免费,捆绑调教一二三区,97影院最新理论片,色之久久综合,国产精品日韩欧美一区二区三区

關(guān)于英語(yǔ)的作文

國(guó)內(nèi)英語(yǔ)新聞:China loads fuel at first英語(yǔ)作文

時(shí)間:2022-03-24 19:00:04 關(guān)于英語(yǔ)的作文 我要投稿

國(guó)內(nèi)英語(yǔ)新聞:China loads fuel at first英語(yǔ)作文

  無(wú)論是在學(xué)校還是在社會(huì)中,大家一定都接觸過(guò)作文吧,作文是經(jīng)過(guò)人的思想考慮和語(yǔ)言組織,通過(guò)文字來(lái)表達(dá)一個(gè)主題意義的`記敘方法。那么,怎么去寫作文呢?以下是小編為大家收集的國(guó)內(nèi)英語(yǔ)新聞:China loads fuel at first英語(yǔ)作文,歡迎閱讀,希望大家能夠喜歡。

國(guó)內(nèi)英語(yǔ)新聞:China loads fuel at first英語(yǔ)作文

  FUZHOU, Sept. 4 (Xinhua) -- Fuel loading started Friday at China's first nuclear power unit using Hualong One technology, a domestically developed third-generation reactor design, bringing the unit one step closer to operation.

  The loading started at 3:30 p.m. at the No. 5 nuclear power unit in the city of Fuqing, east China's Fujian Province, according to the China National Nuclear Corporation (cnnC).

  Hualong One reactors were jointly designed by two nuclear power giants, China General Nuclear Power Group and the cnnC, and passed inspection by a national panel in August 20xx.

  The nuclear power unit, which began construction in 20xx, is expected to start operation this year.

  The No. 1 to No. 4 nuclear power units of the Fuqing project were put into commercial operation in September 20xx, and have generated a total of 130 billion kilowatt-hours of electricity so far. Compared with power generation with fossil fuels, the four nuclear power units have cut carbon-dioxide emissions by 105.44 million tonnes, according to the cnnC.

【國(guó)內(nèi)英語(yǔ)新聞:China loads fuel at first英語(yǔ)作文】相關(guān)文章:

My First Job英語(yǔ)美文09-18

My First Kiss英語(yǔ)美文07-31

“Sorry” First英語(yǔ)美文欣賞07-11

Popular Sports in China英語(yǔ)六級(jí)作文08-04

My First Chemistry Teacher英語(yǔ)四級(jí)作文06-26

英語(yǔ)新聞閱讀資料05-04

劍橋少兒英語(yǔ)預(yù)備級(jí)上冊(cè)who is the first05-19

英語(yǔ)新聞閱讀稿精選05-14

英語(yǔ)新聞閱讀資料參考05-08

英語(yǔ)新聞閱讀資料翻譯05-04